Coal and mineral rock close-up — CFI Industries services for mines, ore transport and structural mining fabrication in Quebec.

Mining conveyors and structural fabrication for North Shore mines

CFI Industries designs and installs high-capacity belt conveyors, heavy structures and handling equipment for iron mines, ore carriers and extraction sites of the North Shore, Fermont and Schefferville. Structural CWB welding, fast camp mode mobilization, Cognibox compliance.

Why mining companies choose CFI for Quebec

The Quebec mining sector — iron, ilmenite, niobium, lithium, rare earths — demands suppliers capable of operating in extreme conditions: isolation, −40 °C temperatures, very strict OHS requirements, short shutdown windows, complex logistics. CFI Industries has built its mining expertise on the North Shore for over 25 years.

Our crews intervene in camp mode at Fermont, Schefferville and extraction sites along Route 389 and the Trans-Quebec-Labrador road. Structural CWB W47.1 welding for heavy frames, fabrication of high-capacity belt conveyors, repair of primary and secondary transporters, transfer chute modifications.

Our Saint-Bruno workshop fabricates pre-assembled conveyor sections ready to ship — major time saving on remote sites. All quality documentation (welding procedures, material certificates, OIQ engineer-stamped drawings) accompanies each delivery.

Mining sector challenges — and our responses

Can you mobilize on remote sites (Fermont, Schefferville)?

Yes. We have operated in camp mode for 25+ years. Road or rail transport logistics (Schefferville accessible only by train), full crew handling on site (housing, transport, meals). Mobilization possible within 48-72 h on notice.

Do your certifications meet ArcelorMittal and IOC requirements?

Yes — Cognibox CMS, Alcumus eCompliance, Mining Safety Code site training. Current certificates, supplier audit passed. Documented experience on sites of major miners operating in Quebec and Labrador.

Can you fabricate pre-assembled sections?

It's our standard approach for mining. We pre-assemble conveyor sections, transfer chutes and structures in our Saint-Bruno workshop, then ship by special convoy or container. Reduces on-site installation time by 40-60%.

Do you include engineering?

Yes, senior engineer member of OIQ. Structure calculations, belt and drum sizing, motor and reducer selection, stamped drawings. Compliance with CSA S16, W47.1, B167. Possible Pareto review with your engineering department.

Miners and contractors who trust us

We regularly work on mining sites in Nord-du-Québec, North Shore and Labrador, directly or through primary contractors:

  • — ArcelorMittal Mines Canada (Mont-Wright, Fire Lake)
  • — Iron Ore Company of Canada — IOC (Labrador City)
  • — Tata Steel Minerals Canada
  • — Aluminerie québécoise majeure Iron and Titanium (Lac Tio, Sorel)
  • — Niobec Mine (Saint-Honoré, Saguenay)
  • — Primary mining EPCM contractors

Mining project in planning?

Quote including fabrication, transport, camp mobilization, engineering and installation. 48-72 h mobilization for emergencies. For planned shutdowns, plan 4-12 weeks depending on scope.

Request a quote